Shoring
Tehran Heart Center
- Client Tehran Heart Center Hospital
- Consultant Gorouh-e-Chahar Consulting Engineers
- E.P.C Contractor Baspar Pey Iranian company
- Location Tehran, Iran
- Start Date September 2012
- Shoring Method Nailing & Anchorage
- Excavation Depth 22 m
- Stabilized Area 2,300 m2
- Total Nailing & Anchorage Length 4,880 m
- Total Soil Excavation Volume 30,000 m3
- Execution Period 150 days