Shoring | Drainage and Insulation
Soheil Complex (Chaharbagh)
- Client Omran and Tosee Paidar Iranian Investment company
- Consultant Sano Consulting Engineers
- E.P.C Contractor Baspar Pey Iranian company
- Location Tehran, Iran
- Start Date June 2013
- Shoring Method Nailing & Anchorage
- Excavation Depth 40 m
- Stabilized Area 12,740 m2
- Total Nailing & Anchorage Length 33,660 m
- Total Berliner Columns Length 3,244 m
- Steel Structure Weight 81 Ton
- Total Soil Excavation Volume 295,819 m3
- Execution Period 1444 days