Sheikh Bahaei GIS post Trench

Completed projectsShoring

Trench Stabilization
Design and Execution of Reinforced
Retaining Wall

  • Client Great Tehran Electerical Distribution company
  • Consultant Mashanir company
  • General Contractor Parsian Abdan Gostar company
  • E.P.C Contractor Baspar Pey Iranian company
  • Location Tehran, Iran
  • Start Date July 2010
  • MSEW Facing Type Concrete Block with a special design
  • Reinforcing Materials Geogrid Polyester with PVC coating
  • Amount of Reinforcing Materials Amount of Reinforcing Materials
  • MSEW Facing Area MSEW Facing Area
  • Shoring Method Nailing
  • Excavation Depth 20 m
  • Stabilized Area 400 m2
  • Total Nailing Length 600 m
  • Total Soil Excavation Volume 53,901 m3
  • Execution Period 120 days