Execution of structural concrete piles
Saman Faraz Towers
- Client Behnad Bana Construction company
- Consultant Tadbir Sahel Pars company
- E.P.C Contractor Baspar Pey Iranian company
- Location Tehran, Iran
- Start Date June 2018
- Shoring Method Nailing & Anchorage
- Excavation Depth 35 m
- Stabilized Area 11,935 m2
- Total Nailing & Anchorage Length 34,996 m
- Total Length of Concrete Piles & Soldiers 1,525 m
- Total Soil Excavation Volume 215,000 m3
- Soil Improvement Method concrete piles
- Total Volume of Soil Improvement 1,750 m3
- Execution Period 365days