Trench Stabilization
Design & Execution of Bridge Abutment MSE Walls
Milad Tower Access Roads & Yademan Bridge Trenches
- Client Tehran Engineering and Civil Organization
- Consultant Ardam Consulting Engineers company
- General Contractor Band Construction company
- E.P.C Contractor Baspar Pey Iranian company
- Location Tehran, Iran
- Start Date December 2009
- MSEW Facing Type Gabion
- Reinforcement Materials Geogrid Polyvinyl Alcohol with PVC coating
- Amount of Reinforcing Materials 8,500 m2
- MSEW Facing Area 400 m2
- Shoring Method Nailing
- Excavation Depth 25 m
- Trench Stabilized Area 4,500 m2
- Total Nailing Length 4,400 m
- Execution Period 210 days