Shoring | Drainage and Insulation
Mika Knots Building
- Client MIKA Construction Group
- Consultant Soroush Darya Pey company
- E.P.C Contractor Baspar Pey Iranian company
- Location Tehran, Iran
- Start Date August 2018
- Shoring Method Nailing & Anchorage
- Excavation Depth 40 m
- Stabilized Area 3,789 m2
- Total Nailing & Anchorage Length 22,678 m
- Steel Structure Weight 156 Ton
- Total Soil Excavation Volume 37,812 m3
- Execution Period 195 days