Shoring & Soil Improvement to increase loading capacity and to
control soil settlement and liquefaction | Drainage and Insulation
Kelarabad Residential Complex
- Client Hamghadam Trading company
- E.P.C Contractor Baspar Pey Iranian company
- Location Kelarabad, Iran
- Start Date March 2022
- Soil Improvement Method Jet Grouting & DSM
- Total Volume of Soil Improvement 14,641 m3
- Method of Shoring Secant Wall and Truss
- Excavation Depth 5.5 m
- Excavation Soil Volume 2,100 m2
- Execution Period 351 days