Istanbul Residential Complex

Completed projectsShoring

Shoring | Drainage and Insulation

  • Client Ofogh Visman Construction Engineering company
  • E.P.C Contractor Baspar Pey Iranian company
  • Location Tehran, Iran
  • Start Date August 2023
  • Shoring Method Nailing & Anchorage
  • Excavation Depth 17.5 m
  • Stabilized Area 2,29 m2
  • Total Nailing & Anchorage Length 4,306 m
  • Steel Structure Weight 18 Ton
  • Total Soil Excavation Volume 12,000 m3
  • Execution Period 140 days

All rights of this website belong to Baspar Pay Iranian Company.

02154113235

Need Consulting?

Enter your mobile number. Our experts will contact you as soon as possible.