Shoring | Drainage and Insulation
Iraj Residential Building
- Client Omran Azarestan company
- E.P.C Contractor Baspar Pey Iranian company
- Location Tehran, Iran
- Start Date August 2023
- Shoring Method Nailing & Anchorage
- Excavation Depth 23 m
- Stabilized Area 2,283 m2
- Total Nailing & Anchorage Length 4,682 m
- Steel Structure Weight 301 Ton
- Execution Period 288 days