Shoring & Soil Improvement to increase loading
capacity and to control soil settlement | Drainage and
Insulation
Hachiroud Berlian Complex
- Client Eng. MohammadMehdi Alinaghian
- E.P.C Contractor Baspar Pey Iranian company
- Location Hachiroud, Iran
- Start Date February 2021
- Soil Improvement Method DSM & Piling
- Total Volume of Soil Improvement 5,028 m3
- Total Piling Length 1,120 m
- Shoring Method Secant Wall and Truss
- Excavation Depth 7 m
- Excavated Soil Volume 2,150 m2
- Execution Period 740 days