Shoring| Design & Execution of Foundation
Farhang Shahr Complex
- Client Shiraz Municipality
- Consultant Ista Sazeh Chakaad Consulting Engineers
- General Contractor Shams Omran Engineering and Construction company
- E.P.C Contractor Baspar Pey Iranian company
- Location Shiraz, Iran
- Start Date June 2016
- Shoring Method Nailing & Anchorage
- Excavation Depth 19 m
- Stabilized Area 7,828 m2
- Total Nailing & Anchorage Length 55,956 m
- Total Berliner Columns Length 1,256 m
- Execution Period 270 days