Abshenasan Highway Trench (Sattari Highway Intersection)

Trench Stabilization
Design and Execution of Reinforced
Retaining Wall

  • Client Municipality of Tehran (District 5)
  • Consultant Ardam Consulting Engineers
  • General Contractor Split company
  • E.P.C Contractor Baspar Pey Iranian company
  • Location Tehran, Iran
  • Start Date September 2010
  • MSEW Facing Type Potted Block
  • Reinforcing Materials Geogrid Polyester with PVC coating
  • Amount of Reinforcing Materials 7000 m2
  • Shoring Method 2000 m2
  • Shoring Method Nailing
  • Excavation Depth 10 m
  • Stabilized Area 250 m2
  • Total Nailing Length 287 m
  • Execution Period 120 days

All rights of this website belong to Baspar Pay Iranian Company.