Shoring
Islamic Azad University, Science and Research Branch
- Client Islamic Azad University
- Consultant Gerantin Consulting Engineers
- General Contractor Omran Azarestan company
- E.P.C Contractor Baspar Pey Iranian company
- Location Tehran, Iran
- Start Date December 2015
- Shoring Method Nailing & Anchorage
- Excavation Depth 64 m
- Stabilized Area 11,600 m2
- Total Nailing & Anchorage Length 31,000 m
- Total Soil Excavation Volume 140,000 m3
- Execution Period 583 days